These works are carried out as part of group of works A, subsystem A2 “Transport collectors: “Zamet” area (collector “Z1”), “Kantrida” area (collector “K1”), “CS Dražička” pumping station and “CS Kantrida” pumping station.
The new pumping station with associated pressurized water will be used to drain exclusively sanitary wastewater to the location of the new wastewater treatment plant (UPOV) on the Delta and will replace the previous mixed drainage system that received sanitary and rainwater from the area of Grbci local committee.
Mixed drainage systems are being replaced to preserve public health, protect water and water-dependent ecosystems, and reduce the risk of pollution.
We thank all citizens for their patience and understanding, and we invite them to follow the progress of works and changes in traffic regulation for their safety and that of others involved in traffic.