These are works on the excavation of a new construction outlet pit, which is used for the construction of a section of the sewage collector using the flush installation method (drilling and horizontal pressing of the pipe) from the connection to the constructed collector in Krešimirova Street to the new waste water treatment plant (UPOV) on the Delta.
With the planned traffic solution, the two-lane approach of Adamićeva Street in the Jadranski trg zone is reduced to one traffic lane with a road fence and traffic signals installed, while traffic in the western part of the street is directed to the existing condition until Žabica Square.