The temporary regulation of traffic is changing, and will take place in the following phases::
- phase C1 (addition D01) in the period from 23.12.2022. until 07.01.2023. (Viktor Car Emin and Zdenko Petranović streets)
- phase C2 (addition D01) from 08.01.2023. until 20.01.2023. (Viktor Car Emin and Zdenko Petranović streets)
The construction works are being carried out on the sidewalk and roadway of Viktora Cara Emin Street, mainly on the south side of the street from the entrance to Prvogi Maja Street to the entrance to Nikola Tesla Street.
In phase C, traffic is prohibited in the direction of Vukovarska Street – Fiorella la Guardia Street, and traffic is diverted through Nikola Tesla Street, Krešimir Street and Manzoni Street. By occasionally occupying road and pedestrian areas, traffic lanes are diverted and, if necessary, multi-lane traffic is reduced to one lane. Therefore, occasional stoppages or difficult traffic to a greater extent than the existing ones are expected. It is realistic to expect that users will notice the resulting changes and choose appropriate alternative movement routes themselves.
- phase D (supplement D02) from 08.012023. until 08.01.2023. (Cambierieva and Krešimirova streets)
The works are being carried out in the sidewalk at the junction of Cambierieve and Krešimirova Streets.